Stronachullin Hydro

  • Intake dam for 450mm pipe

    Reinforced concrete structure to dam the river. Constructed with a river diversion where the wing wall will be.

  • Steel Frame Power House

    Reinforced concrete and steel frame to house the turbine infrastructure. Built in a very challenging location.

  • 800mm pipework being backfilled

    Thousands of tonnes of rock was removed to provide the pipe corridor to falls for the 800mm pipeline.

  • Hydro Intake Dam and Coander Screen

    Reinforced concrete dam and intake structure was constructed with a river diversion beneath the main wing wall.