Gordonstown Wind Farm, Aberdeenshire

  • Anchor Cage Installation

    Ducts installed, blinding and bottom mat in, Anchor cage installation (1st half)

  • Concrete Pour Commences

    Anchor cage levelled, steel work completed and surround backfilled, time for the concrete.

  • 390m³ Concrete Pour

    Concrete pours lasted well into the nights due to the volume of concrete necessary.

  • Tower Lifting

    With the concrete achieving specification and the load rings being within 0.2mm the tower sections went up.