Jaguar-Landrover

  • Concrete slabs under construction

    Concrete pump being used for the pouring of some slab sections

  • Interceptor Installation

    almost 5m deep controled by the total station , the fuel interceptor excavation

  • Machine Control in operation

    The sub formation was prepared using machine control

  • Temporary building erection

    The slab was designed for a temporary building and to become a car park at a later date.